The Future of No-Dig Technology 

Our Drain-Jet Robotics (powered by Mauerspecht) system is designed for the large-scale removal of issues such as limescale, failed liners, concrete ingress, mass roots, etc.  

The system operates at up to 1500bar and 24l/min with constant CCTV monitoring and full control over the directional jet. It is also capable of working in pipework from 150mm up to 1200mm. We have found the system is at least 10x more effective than standard milling works when it comes to large-scale precision cutting.

With our patented endless-rotation feature for continuous cutting and high-quality CCTV monitoring, we are proud to say there is nothing else on the market like it!  

Meet the robots – Bruno, Bruno Mini and Brunhilde

Our formidable robots can travel into all drains and sewers including egg profiles for mass obstruction removal. We are proud to have the exclusive rights to this unique technology in the UK. Bruno, Bruno Mini and Brunhilde (along with our milling robots) make us a one-stop-shop for all aspects of robotic cutting within the drainage industry.  

 Bruno

The original robot to utilise the DrainJet Robotics technology.  Bruno has a patented 'endless-rotation' feature which is completely unique to this system.  This feature cannot be found anywhere else and allows for continuous cutting across the face of the pipe.  

Ultra High Pressure cutting up to 1500 bar and capabilities in drains and sewers of all shape profiles from 300mm to 1200mm. 

Bruno Mini

The same power, technology, and capabilities in a smaller robot. Nimbler for when access is restricted or limited in a smaller diameter system. Travels in drains of all shape profiles from 225mm to 450mm.

Brunhilde

The latest addition to the Drain-Jet Robotics family! Brunhilde now gives us the ability to work within 150mm pipework, something which would previously be impossible. 

 Brunhilde is an exciting addition to our fleet and a sign of the continual innovation/investment at Datomic and our partners at Mauerspecht. 

A Cost-Effective Alternative

Datomic have been involved in a range of jobs where slurry, cement or concrete have entered the drainage system during the construction process. This can cause major issues when trying to hand over a new build project and can lead to expensive, time consuming and intrusive excavations. Our system removes the pain of excavating and restores flow to the system in the quickest and most-convenient way possible!  

We’re Waiting For Your Call

Call us now for a rapid response on 0151 213 0177 or send us your details using our contact form and we will be in touch with a solution.  
Share by: